Brighton
- PROJECT TYPE: Residential
- DATE: JUNE 2020
Overview
One stop shop. Internal plastering, insulation, external concrete finish and render.
CHAD completed:
- Suspended ceilings and straight metal battens to all ceilings and furring channel plus clips to various walls in basement.
- Installed fire rating plasterboard to partying walls and fire rated beams within the ceiling space.
- 10mm plastered walls to ceilings.
- Flexible plasterboard to curve walls.
- Square set cornice.
- Insulation – we supplied insulation to the concrete ceiling of the garage, walls and ceilings.
- Reveals to all windows and doors.
- Installed 50mm AAC panel.
- Application of base coat render.
- Application of light grey concrete finish.